Skip to content
English
  • There are no suggestions because the search field is empty.

Release 2025-02-08

Version 1.41.8 @ migration 0194

The major feature introduced in this release is the advanced CO2 calculation methodology. Each process step evaluates its own CO2 foot print, which is summed over the process chain and also considers embodied carbon of the build material.

Additions

  • CO2 calculation was improved by a more granular calculation method.
  • In the comparison view the displayed columns can now be customized. User may choose from: Lot Size, Feasibility, Cost, Lead Time and Carbon.
  • Break even calculation is now optional and can be triggered from the cost tab to save calculation time.
  • Calculation steps (Glass Box) can be recalculated on demand. The resulting excel sheets are ordered in the same manner as the process chain suggest. The full process step is displayed in the first row of each sheet.
  • In the pricing configurator toggle button for raw input are moved next to the corresponding input fields.
  • If feedback values exist, the user is warned before changing the lot size. Changing the lot size will invalidate feedback values.

Bug Fixes

  • Machine creation popup fails validation process.
  • log and ln patterns cannot be calculated in expressions.
  • Newly created machines should highlight and appear on top.
  • Custom process synonyms not utilized in process step library.
  • Parts greater 1000 mm display units incorrectly.
  • Number values cannot contain “.0” when typing.
  • Unsubscribe link not working.
  • Expression based steps fail, if they contain fixed cost or process times are zero.
  • Assets cannot be uploaded due to asset type selection fails.
  • Support requests cannot be sent.
  • New PRP user cannot upload parts by default.
  • Infill percentages not saved.
  • User names missing from audit logs.
  • Faulty validators in process step modal.
  • Cannot set layer height in AM Properties.
  • Price ranges in My Suppliers display decimal places.
  • Cannot add process step for “All Processes” anymore.
  • Changing lot size does not trigger recalculation.
  • Process chain names are too long when created from a template.
  • Calculation may fails, if parts per job is 0 or null.
  • Cost breakdown for pre, post, main and material doe snot sum up, if costs are feedbacked in shared mode.
  • “Add Part” popup cannot be closed.